To repair the deteriorated piles of the Snake River bridge, Structural Concrete® Underwater Hand Pack was applied for void reshaping, followed by PileForm F fiberglass reinforced plastic pile and Pile Jacket Epoxy Grout LPL, providing a lasting solution without pile replacement.