To repair the corroded dam structures from 1945, flowing water was halted using Polyurethane, cracks sealed with epoxy, and spalls fixed using Five Star Structural Concrete® or Five Star® Grout. The dam was treated with corrosion inhibitors and Five Star® Waterproofing for added protection.