In the fast-paced world of commercial and industrial operations, minimizing downtime is crucial. Our “Multi-Life Dynamic Load Return to Service System” swiftly addresses foundation issues with the formidable strength of Structural Concrete ES-60 and long working time, followed by capping options such as Rapid Epoxy Grout, SP Epoxy Grout PG, or DP Epoxy Grout PG, ensuring efficient repairs and reinforcement while significantly reducing costly interruptions.
PRODUCT | COMPRESSIVE STRENGTH | WORKING TIME | MIN. DEPTH | MAX. DEPTH | COMPRESSIVE | TIME UNTIL GROUT POUR | TIME UNTIL LOADING | RETURN TO SERVICE TIMEFRAME |
Structural Concrete ES-60 | 4,000 psi | 90 mins. | 0.25" | Depth of pour determined by aggregate. | ASTM C 109 | 8 Hrs | ||
Grouting Option #1 | 4,000 psi | 45 mins. | 2" | 18" (457 mm) volumes up to | ASTM C 579 B | + 5 Hrs | = 13 Hrs | |
Grouting Option #2 | 8,000 psi | 30 mins. | ½” | 3" (75 mm) | ASTM C 579 B | + 8 Hrs | = 16 Hrs | |
Grouting Option #3 | 15,000 psi (103 MPa)
12 hours | 45 mins. | 2" | 18" (457 mm) volumes up to | ASTM C 579 B | + 12 Hrs | = 20 Hrs | |
Grouting Option #4 | 16,500 psi 24 hours | 30 mins. | 1 " | 4" (100 mm), or volumes up to | ASTM C 579 B | + 24 Hrs | = 32 Hrs | |
Grouting Option #5 | 9,000 psi | 75 mins. | ½” | 6" (150 mm) | ASTM C 579 B | + 24 Hrs | = 32 Hrs |